11/15/2018

University of West Georgia originally specified VCT in their Biology Building renovation.  Due to initial cost concerns and the long-term maintenance costs of floor finish, a decision was made to diamond hone and add the protective concrete guard SentryGuard. 

It was a long project that encompassed patching, repairs, and ended with diamond honing and the application of SentryGuard.  The decision to utilize the existing substrate and create a sustainable, long-lasting and low maintenance flooring system will provide the university with all the benefits of concrete and none of the down sides of floor covering maintenance and replacement.

To learn more about CFE and SentryGuard for concrete, contact your sales and service representative. If you do not yet have a representative, please call 770.387.2728 or email [email protected].